Menu

Commercial Solutions

C&I rooftop supply, from 20 kW to 500 kW

Three-phase grid-tie inverters and high-efficiency modules for offices, retail and warehousing — supplied to EPC contractors on project schedules.

  • Net-metering compliant output
  • 1–110 kW three-phase string inverters
  • Bin-sorted pallets, no on-site sorting
  • Dispatch in 5–7 working days from stock
Commercial rooftop solar array
110 kW Largest single string inverter
5–7 Working days to dispatch
22 States with active supply
100% Modules EL and flash tested

The Problem

What this segment actually struggles with.

Schedule risk

A module that arrives three weeks late costs more than it saved on price.

Net metering approval

DISCOM sign-off depends on compliant inverters and complete documentation.

Documentation burden

Consultants want datasheets, test reports and certificates before approval.

Mixed-bin pallets

Sorting modules by power on a live commercial roof wastes a day of labour.

How It Comes Together

What we supply, and who fits it

IYRO manufactures the hardware and backs the warranty. An appointed dealer sizes, installs and commissions the system on site.

  1. N-Type TOPCon modules

    610 Wp balances string length against roof access and structure cost.

  2. Three-phase grid-tie inverters

    15–110 kW with dual MPPT and built-in anti-islanding.

  3. DC and AC cable

    UV-stable DC solar cable and LT AC cable to IS standards.

  4. Documentation pack

    Datasheets, IEC reports and certificates issued with the despatch.

Applications

Where it gets specified

Office buildings

Office buildings

Rooftop and carport arrays under net metering.

Warehousing

Warehousing

Large-span roofs with long string runs.

Retail and malls

Retail and malls

High daytime load matched to generation.

Cold storage

Cold storage

Continuous daytime demand, strong solar fit.

Recommended

Product families for this segment

Ranges, not individual models. Specifications live on each product page.

All products

Working With Us

From enquiry to warranty

01

Specification

Send the load, site and schedule. We come back with ratings and a bill of materials.

02

Quotation

Pricing, current lead time and datasheets, usually within one working day.

03

Production

Standard ratings ship from stock; project volumes are scheduled on confirmation.

04

Despatch

Bin-sorted pallets with serial records, flash data and the certificate pack.

05

Commissioning support

Our engineers back your installer by phone through start-up.

06

Warranty

Claims handled by the plant that built the product, for the full term.

Questions

Asked by commercial buyers.

Technical support
Do you supply direct to end customers?

We supply EPC contractors, dealers and, for larger projects, directly to the buying organisation. Installation is carried out by your chosen EPC.

Are the inverters net-metering compliant?

Yes. All grid-tie models include anti-islanding protection and are supplied with the certificates DISCOMs ask for at approval.

Can you hold stock against a project schedule?

Standard ratings are held as finished goods. For project quantities we schedule production on confirmation and commit to a despatch date in writing.

Are modules supplied bin-sorted?

Yes. Pallets are packed by power bin so nobody has to sort modules on a live roof.

Next Step

Tell us the project, we will quote it.

Send the site, the load and the schedule. Pricing, lead time and datasheets come back within one working day.

Used only to prepare your quotation. Privacy policy