Menu

Certification & Compliance

Approved, tested and listed.

The marks that decide whether a bid is eligible to be opened, what a certificate actually covers, and where the per-unit test data behind your pallet comes from.

Every standard we build to

What each one tests, and what it means for the document pack on your project.

CE

European Conformity

Declaration against applicable EU directives.

A manufacturer's declaration of conformity supported by test evidence against the Low Voltage and EMC directives, with a technical file retained for inspection.

RoHS

Restriction of Hazardous Substances

Restricted substances in the bill of materials.

Limits on lead, mercury, cadmium, hexavalent chromium and specified flame retardants across the components that make up the finished product, evidenced by supplier declarations and material testing.

What A Certificate Does Not Say

A certificate qualifies the design. It says nothing about your pallet.

IEC 61215 is a type approval: a handful of sample modules are put through thermal cycling, damp heat and mechanical load, and the design passes or it does not. It is essential, and it is evidence about a design tested years ago — not about the modules on your delivery note.

That gap is closed on the line, not on a certificate. Every module is electroluminescence imaged before and after lamination and flash tested at standard test conditions, and both records are kept against the serial number. We issue them on request, including for modules already installed.

Next Step

Need a document pack for a tender?

Send the tender reference and the models being quoted. The quality team returns the current revision of every applicable certificate and test report as one pack — before you order, not after.