Menu

Certification & Compliance

Approved, tested and listed.

The marks that decide whether a bid is eligible to be opened, what a certificate actually covers, and where the per-unit test data behind your pallet comes from.

Every standard we build to

What each one tests, and what it means for the document pack on your project.

ALMM List-I

Approved List of Models and Manufacturers

MNRE enlistment for solar PV modules.

Enlistment of specific module models against a verified factory inspection and production capacity audit by the Ministry of New and Renewable Energy. Enlistment is model-specific: a rating that is not on the list is not covered by the listing, even if it comes off the same line.

BIS — IS 14286

Crystalline silicon terrestrial PV modules

Mandatory Indian registration for PV modules.

The Indian adoption of IEC 61215. Registration under the BIS Compulsory Registration Scheme, granted against testing at a BIS-recognised laboratory and tied to a specific manufacturing location.

IEC 61215

Design qualification and type approval

Does the module design survive 25 years outdoors?

Thermal cycling, humidity freeze, damp heat, mechanical load, hail impact, wet leakage and hot-spot endurance on sample modules, with a defined limit on power degradation after each sequence.

IEC 61730

PV module safety qualification

Electrical, fire and mechanical safety.

Construction requirements (Part 1) and testing (Part 2) for electric shock hazard, fire propagation and mechanical failure, including the system voltage the module is rated to operate at.

IEC 62109 / IS 16221

Safety of power converters for PV systems

Inverter electrical and fire safety.

General safety requirements (Part 1) and the particular requirements for inverters (Part 2): isolation, protective earthing, thermal limits, enclosure protection and single-fault behaviour. IS 16221 is the Indian adoption.

IS 16169

Islanding prevention for grid-tied inverters

The inverter disconnects when the grid goes down.

The test procedure for anti-islanding: the inverter must stop exporting within a defined window when the utility supply fails, so it cannot back-feed a line that a lineman believes is dead.

IS 1651

Stationary lead-acid batteries, tubular positive plates

Capacity, endurance and construction for tubular cells.

Rated capacity at the declared discharge rate, endurance in cycles, charge retention and the construction requirements specific to tubular positive plates.

MNRE Specification

Solar water pumping systems

The technical specification pumps are supplied against.

Motor and controller ratings, minimum daily water output at a stated head and insolation, protection features and the test protocol used to confirm them.

IS 694 / EN 50618

Cable insulation and voltage rating

Conductor, insulation and rated voltage.

IS 694 for PVC-insulated cables up to 1100 V on the AC side; EN 50618 for cross-linked DC cable rated for the temperature, UV exposure and 25-year service life expected on an array.

IS 16102

Self-ballasted LED lamps

Performance and safety for LED lamps.

Luminous flux and efficacy, colour characteristics, endurance and the safety requirements for self-ballasted LED lamps, under BIS compulsory registration.

What A Certificate Does Not Say

A certificate qualifies the design. It says nothing about your pallet.

IEC 61215 is a type approval: a handful of sample modules are put through thermal cycling, damp heat and mechanical load, and the design passes or it does not. It is essential, and it is evidence about a design tested years ago — not about the modules on your delivery note.

That gap is closed on the line, not on a certificate. Every module is electroluminescence imaged before and after lamination and flash tested at standard test conditions, and both records are kept against the serial number. We issue them on request, including for modules already installed.

Next Step

Need a document pack for a tender?

Send the tender reference and the models being quoted. The quality team returns the current revision of every applicable certificate and test report as one pack — before you order, not after.