What each one tests, and what it means for the document pack on your project.

EL Imaging Report

Electroluminescence record

Per-module image, before and after lamination.

An electroluminescence image of every module produced, taken before lamination and again after, revealing micro-cracks, broken fingers and inactive cell areas that are invisible to the eye.

Issuing body
IYRO in-house line test
Scope
Per serial number, on request

Flash Test Report

Measured I-V performance

The actual measured output of your modules.

A simulator flash at standard test conditions recording Pmax, Voc, Isc, Vmp, Imp and fill factor for every module, with the sorting bin it fell into.

Issuing body
IYRO in-house line test
Scope
Per batch or per serial, on request

Routine Test Certificate

Pre-despatch electrical test

Every unit, before it leaves the building.

Insulation resistance, high-voltage withstand, functional and protection checks carried out on each unit before packing, recorded against its serial number.

Issuing body
IYRO in-house line test
Scope
Per serial number, supplied with despatch

What A Certificate Does Not Say

A certificate qualifies the design. It says nothing about your pallet.

IEC 61215 is a type approval: a handful of sample modules are put through thermal cycling, damp heat and mechanical load, and the design passes or it does not. It is essential, and it is evidence about a design tested years ago — not about the modules on your delivery note.

That gap is closed on the line, not on a certificate. Every module is electroluminescence imaged before and after lamination and flash tested at standard test conditions, and both records are kept against the serial number. We issue them on request, including for modules already installed.